Installation Engineering

MOP has developed its own in-house resources to supply each project with its installation engineering requirements as per the latest international Rules & standards in the oil & Gas field (e.g. DNV-OS-F101, GL/Noble Denton, API RP 2SK, ASME, and AWS ….etc). Such engineering includes but not limited to:

  • Developing welding procedures to suit different material used in awarded projects
  • Non destructive testing
  • Lifting plans of the various projects components /packages
  • Submarine cables , Umbilical ,Pipelines & coiled tubing laying analysis
  • Shore approach & shore pulling calculations
  • Pipelines/submarine cables on-bottom stability check.
  • J-Tubes pull-ins
  • Single point mooring system design & analysis
  • Barges & vessels mooring analysis