Installation Engineering
MOP has developed its own in-house resources to supply each project with its installation engineering requirements as per the latest international Rules & standards in the oil & Gas field (e.g. DNV-OS-F101, GL/Noble Denton, API RP 2SK, ASME, and AWS ….etc). Such engineering includes but not limited to:
- Developing welding procedures to suit different material used in awarded projects
- Non destructive testing
- Lifting plans of the various projects components /packages
- Submarine cables , Umbilical ,Pipelines & coiled tubing laying analysis
- Shore approach & shore pulling calculations
- Pipelines/submarine cables on-bottom stability check.
- J-Tubes pull-ins
- Single point mooring system design & analysis
- Barges & vessels mooring analysis